Freight at Beacon Park... In 2020? After dropping rail up north, MBTA's empty welded rail train is seen sitting crewless in the abandoned CSX Beacon Park Yard. The plan was originally to... (more)
The MassDOT/MBTA Rail Extra is seen coming off the New Hampshire Route at Tower A Interlocking. To the left, construction can be seen at the Cambridge Crossing development. This area is constantly... (more)
The MassDOT/MBTA Rail Extra is seen passing through the Wedgemere section of Winchester on the old Boston & Maine New Hampshire Route. The train ran up the Western route, ran around at Wilmington ... (more)
The MassDOT/MBTA Rail Extra is seen passing Whittemore Pond in the Montvale section of Woburn on the old Boston & Maine New Hampshire Route. The train ran up the Western route, ran around at Wilmi... (more)
Rail extra crawling through Belmont, Mass. This time they were dropping rail on track 2.
The Keolis Rail Extra is going through Waverly Oaks in the photograph. The train came out of the West Cambridge facility (Alewife) and continued to head west very slowly as they dropped rail. The ... (more)
The Keolis rail extra is coming off the West Cambridge siding. The train came out of the West Cambridge facility (Alewife) and continued to head west very slowly as they dropped rail. The farthest... (more)
Inbound and outbound MBTA commuter trains cross over the Charles River at the throat of Boston's North Station.